Research of productivity of drilling tools when driving main crosscut of horizon of the second stage of opening
Authors: S.A. Kharin
Researches of parameters influencing on mine working driving intensity and rational organization of building have been conducted. It is shown that the productivity of drilling tools which allows providing required speed of mine working driving increases as far as duration of building of horizon of the second stage of opening reduces, thus the drilling productivity dependence on time of horizon building can be described by a power function.
Files:
2010_11-12 Khar | |
2012-12-14 446.22 KB 1260 |
Tags: productivity • drilling • mine • horizon • organization • driving • speed • stage of opening • function • specific coefficient of increase of the productivity of the drilling on the factor of time
Related news items:
Newer news items:
- Account of earth relief influence on forecasting of horizontal deformations when undermining - 05/01/2013 16:03
- Laboratory research of deformation characteristics of fibrous concrete made of rigid and winding polymer reinforcing fiber - 05/01/2013 16:01
- Direct method of determination of coefficient of friction of a conveyor belt against a barrel - 05/01/2013 15:59
- Research of marginal rock massif stability in regions with watered tectonic violations - 05/01/2013 15:58
Older news items:
- Theoretical and practical aspects of reduction of ore loss on bottom layer of deposit - 05/01/2013 15:54
- On mining and geometrical parameters of inrushes in development workings in deep mines - 05/01/2013 15:53
- Statistical analysis of quality of big diameter boreholes drilling in Krasnoarmeyskiy mining area - 05/01/2013 15:51
- Evaluation of cable transport installations effectiveness in the environment of quarries - 05/01/2013 15:49
- Research of interaction features between a rock massif and an arched support in an excavation with an overhead monorail - 05/01/2013 15:47