- 41. Heuristic control of power consumption by up to 1000 V electrical loads at mining enterprises
- (Content №1 2024)
- ... with iron ore underground mining methods. This enables direct control of the load connection to the industrial power grid to ensure minimum power costs depending on its cost per day ahead. Methodology. ...
- Created on 29 February 2024
- 42. Justification of geodetic monitoring methodology of the retaining walls on the example of the embankment in Kremenchuk
- (Content №1 2024)
- ... monitoring to be carried out with greater reliability in the future and avoid possible forecasting errors. Findings. The results of the analysis of geodetic measurements in the geodetic networks of Kremenchuk ...
- Created on 29 February 2024
- 43. Testing the fragmentation of railway ballast material by laboratory methods using Proctor compactor
- (Content №1 2024)
- ... Purpose. The development of a new method for measuring rock material fracture that is consistent with widely used standards while also being more comparable to real-world railway operating conditions. ...
- Created on 29 February 2024
- 44. Advantages of using CONCRETE CANVAS materials in railway track construction
- (Content №1 2024)
- ... October 31). Metrology. Retrieved from: https://r-design.hu/merorendszerek-szoftverek/atos/atos-5/. 31. International Organization for Standardization (2017). ISO 1101:2017. Geometrical product specifications ...
- Created on 29 February 2024
- 45. Scientific bases and peculiarities of conversion of CHPP anthracite boilers to sub-bituminous coal combustion
- (Content №1 2024)
- ... 9. World Energy Outlook (2023). Chapt 3: Pathways for the energy mix. International Energy Agency, 101-153. Retrieved from https://iea.blob.core.windows.net/assets/42b23c45-78bc-4482-b0f9-eb826ae2da3d/WorldEnergyOutlook2023.pdf. ...
- Created on 29 February 2024