Implementation of a mathematical component in the device development for operational control of the dump truck
- Details
- Category: Content №4 2024
- Last Updated on 28 August 2024
- Published on 30 November -0001
- Hits: 1868
Authors:
P.Shcherbakov, orcid.org/0000-0003-1564-9016, Dnipro University of Technology, Dnipro, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
S.Tymchenko, orcid.org/0000-0002-6314-420X, Dnipro University of Technology, Dnipro, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
S.Moldabayev, orcid.org/0000-0001-8913-9014, Satbayev University, Almaty, Republic of Kazakhstan, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
N.Sarybayev, orcid.org/0000-0001-9856-803X, Satbayev University, Almaty, Republic of Kazakhstan, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
D.Klymenko*, orcid.org/0000-0002-4442-9621, Dnipro University of Technology, Dnipro, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
N.Ulanova, orcid.org/0000-0001-8460-5266, Dnipro University of Technology, Dnipro, Ukraine, e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
* Corresponding author e-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.
Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu. 2024, (4): 041 - 047
https://doi.org/10.33271/nvngu/2024-4/041
Abstract:
Purpose. To create a device for weighing mining rock loaded into the body of a dump truck after each cycle of its excavation. To develop a mathematical block for calculating the net mass of the rock without taking into account extraneous factors affecting the accuracy of the obtained result. To provide operational control of the nominal load of the dump truck by the driver and excavator operator.
Methodology. The methodological basis for solving the task is a comprehensive approach which includes electronic modeling of technical processes, methods of mathematical statistics, analysis of results in a mathematical package and their applied application.
Findings. A functional and principled electrical diagram of the device for weighing the mining rock loaded into the body of a dump truck and transferring the final information to this excavator has been compiled. A mathematical block of the device was created, capable of memorizing the signals received from the primary information sensors before weighing, and subtracting them from the signals received from these sensors after each weighing cycle. As sensors of primary information, it is proposed to use selsyns, which are part of the transformer mode, which are mass-produced by the industry, reliable in operation and easy to maintain.
Originality. The proposed device is made at the level of the invention; its priority is determined by the constructive development and technical solution. Namely, the device is equipped with a multistable memory transformer, to the erasing winding of which a tachogenerator (or tachometer generator) is connected through an amplifier, a chain of series-connected trigger, multivibrator waiting and key, whose output is connected to the recording winding of the multistable memory transformer, as well as the transformer connected to the input winding of the multistable memory transformer. Moreover, the storage capacitor is connected to one of the key inputs, and the input windings of the transformer are connected to the weight sensor.
Practical value. The use of the presented device allows for operational control of the nominal load of the dump truck, objective accounting of transported cargo and realized labor costs, as well as for applying optimal maintenance of cargo and transport works in quarries. In the future, this device will form the basis of a radio telemetry system for dispatching the operation of dump trucks.
Keywords: dump truck, excavator, mathematical block, pulses, voltage, weight sensors, rock mass
References.
1. Vilkul, Y., Slobodyanyuk, V., & Maksimov, I. (2015). Optimization of technological parameters of cyclic flow technology in deep quarries. Hirnychyi Visnyk, 100, 3-7.
2. Shevkun, E., Leshchinsky, A., & Shishkin, E. (2020). Management of explosive crushing of rock mass in quarries. IOP Conference. Series: Earth and Environmental Science, 459. https://doi.org/10.1088/1755-1315/459/2/022072.
3. Shcherbakov, P., Klymenko, D., & Tymchenko, S. (2017). Statistical research of shovel excavator performance during loading of rock mass of different crushing quality. Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu, (1), 49-54.
4. Xiao, W., Liu, M., & Chen, X. (2022). Research status and development trend of underground intelligent load-haul-dump vehicle – a comprehensive review. Applied Sciences, 12(18). https://doi.org/10.3390/app12189290.
5. Vlasov, S., Babenko, V., Tymchenko, S., Kovalenko, V., & Kotok, V. (2018). Determination of rational parameters for jet development of gas hydrate deposits at the bottom of the Black Sea. ARPN Journal of Engineering and Applied Sciences, 13(10), 3334-3339.
6. Tymchuk, I., Malovanyy, M., Shkvirko, O., & Chornomaz, N. (2021). Review of the global experience in reclamation of disturbed lands. Ecological Engineering & Environmental Technology, 22(1), 24-30. https://doi.org/10.12912/27197050/132097.
7. Lintukangas, M., Suihkonen, A., Salomäki, P., & Selonen, O. (2012). Post-mining solutions for natural stone quarries. Journal of Mining Science, 48(1), 123-134. https://doi.org/10.1134/S1062739148010145.
8. Hasanipanah, M., Armaghani, D., Monjezi, M., & Shams, S. (2016). Risk assessment and prediction of rock fragmentation produced by blasting operation: a rock engineering system. Environmental Earth Sciences, 75, 1-12. https://doi.org/10.1007/s12665-016-5503-y.
9. Mertuszka, P., & Kramarczyk, B. (2018). The impact of time on the detonation capacity of bulk emulsion explosives based on Emulinit 8L. Propellants, Explosives, Pyrotechnics, 43(8), 799-804. https://doi.org/10.1002/prep.201800062.
10. Gustafson, A., Schunnesson, H., Galar, D., & Kumar, U. (2013). The influence of the operating environment on manual and automated load-haul- dump machines: a fault tree analysis. International Journal of Mining, Reclamation and Environment, 27, 75-87. https://doi.org/10.1080/1755182X.2011.651371.
11. Saeidi, O., Torabi, S., Ataei, M., & Rostami, J. (2014). A stochastic penetration rate model for rotary drilling in surface mines. International Journal of Rock Mechanics and Mining Sciences, 68, 55-65. https://doi.org/10.1016/j.ijrmms.2014.02.007.
12. Gustafson, A. (2011). Dependability assurance for automatic load haul dump machines. [e-book] Luleå University of Technology. Retrieved from https://www.diva-portal.org/smash/get/diva2:991068/FULLTEXT01.pdf.
13. Vayenas, N., & Xiangxi, W. (2009). Maintenance and reliability analysis of a fleet of load-haul-dump vehicles in an underground hard rock mine. International Journal of Mining, Reclamation and Environment, 23(3), 227-238. https://doi.org/10.1080/17480930902916494.
14. Blischke, W., & Murthy, D. (2000). Reliability: Modeling, Prediction, and Optimization. Wiley, New York. https://doi.org/10.1002/9781118150481.
Newer news items:
- The right to a safe environment: economic and legal guarantees of provision in Ukraine - 28/08/2024 03:23
- Floristic and ecological structure of the landfill vegetation in the Western Forest Steppe of Ukraine - 28/08/2024 03:23
- The effect of petroleum products pollution on environmental soil condition at airport adjacent territory - 28/08/2024 03:23
- Features of the assessment of occupational risks under hazardous working conditions - 28/08/2024 03:23
- Environmental toxicity assessment of mining waste from an abandoned Zn-Pb mine - 28/08/2024 03:23
- Application of modern mathematical apparatus for determining the dynamic properties of vehicles - 28/08/2024 03:23
- Strength analysis of the model 918 wagon under non-typical bulk loads - 28/08/2024 03:23
- Justification of the criterion for optimal control of the self-grinding process of ores in drum mills - 28/08/2024 03:23
- Combined roasting and leaching treatment for reducing phosphorus, aluminum and silicon in oolitic iron ore - 28/08/2024 03:23
- Enhanced oil recovery of deposits by maintaining a rational reservoir pressure - 28/08/2024 03:23
Older news items:
- Assessment of the contamination degree of gas pipeline branches during mined-out space degasification - 28/08/2024 03:23
- Influence of disperse-hardening additive chrome diboride on the structure of carbide matrixes of PDC drill bits - 28/08/2024 03:23
- Sorption capacity and natural gas content of coal beds of Donbas - 28/08/2024 03:23
- Influence of rock shear processes on the methane content of longwall faces - 28/08/2024 03:23
- Study of geodynamic and hydrogeological criteria for assessing the hydrocarbon potential of the Alakol depression - 28/08/2024 03:23